Friday, July 1, 2011

First Day

Day 1 and look what has been accomplished.  At the Child Development Center, the men worked on installing some additional insulation and prepping for tomorrow's drywalling. Also there was a lot of cleaning and organizing that needed to be done today, too. A second door to the kitchen was installed and chasers for the HVAC were installed.


After a short shopping trip for supplies (can you believe a single cantelope was $5.99?  [we didn't buy any]), the ladies worked on meal preparation.  Tina and Suzette began work on a game for the Day of Evangelism on Monday.  The game will be a football toss.  We had two pieces of plywood to prime today.  One piece will become footballs with various size holes to make for a challenging toss.  The other piece will become a receiver.   There is still a lot to go though as we only finished the priming and outlining.  Both should be finished tomorrow.